Project

General

Profile

Feature #28

Updated by Khaled Malhal Abbas 15 days ago

For the production process, a script must be executed to validate the hardware it has installed. Through the same script, many characteristics must be present validate their functionalities. 

 * Network. 
 * Presence of RTC battery. 
 * USB dongle license. 
 * Fan control. 
 * USB power of the camera ports. 
 * Data from cameras (that is no errors) 
 * CAN. 

 Additionally, this script must walk the technician through the whole process. 

 * Update the RTC clock. 
 * Generate a log in the end.

Back